1 kVA to 500 kVA — Site Survey to Commissioning

UPS Installation Services — Professional Commissioning & Load Testing

A UPS is only as good as its installation. Sukhai UPS provides end-to-end UPS installation and commissioning services — from site survey and equipment sizing to full electrical installation, battery bank commissioning, software setup, load testing, and operator training. We ensure your power protection system works exactly as designed from day one.

Call +91-98208-43000
25+
Years of Experience
5,000+
Clients Served
50+
Cities Covered
4.9★
Average Rating
Scope of Work

What Our UPS Installation Includes

Our installation teams handle every aspect of a UPS project — from initial power assessment to final handover. No element is left to chance.

Site Survey & Power Assessment

Detailed survey of the installation site covering floor space, cable routes, incoming power quality, existing earthing system, temperature and humidity, and load requirements.

UPS & Cable Sizing

Load analysis and UPS capacity selection, input and output cable sizing to IS standards, MCB and MCCB sizing for protection, and earthing cable calculation.

Electrical Installation & Earthing

All power cabling, conduit, cable trays, MCB panels, and earthing conductors installed to IS 3043 standards. Proper equipotential bonding and surge protection incorporated.

Battery Bank Installation

Battery racking and cabinet installation, intercell cabling, string design and connections. For extended battery runtimes, multi-cabinet configurations are designed and installed to manufacturers' specifications.

Software Commissioning & Monitoring

SNMP/NMC card configuration, shutdown software setup (PowerChute, Eaton IPM, Vertiv Liebert IntelliSlot), SNMP integration with network monitoring systems, email and SMS alerts configuration.

Load Testing & Operator Training

Full load bank testing to verify runtime under rated load, bypass transfer testing, and runtime vs rated capacity verification. Operator training covers safe operation, alarm response, and emergency shutdown procedures.

Our Process

UPS Installation Process — 6 Steps

Every UPS installation project follows a structured six-stage process to ensure it is completed safely, on time, and to the required standard.

1 — Site Survey

Our engineer visits your site to assess power supply quality, available space, cabling routes, earthing system, and load requirements. Survey findings are documented and form the basis of the installation design.

2 — Design & Proposal

Based on the survey, we prepare a detailed installation design including equipment specification, cable sizes, earthing design, single-line diagram, and project schedule. A written proposal is submitted for your approval.

3 — Material Delivery

UPS equipment, batteries, cabling, conduit, cable trays, and electrical accessories are sourced and delivered to site on the agreed schedule. All equipment is inspected on delivery for transit damage.

4 — Electrical Installation

UPS positioning, all input/output cabling, battery connections, earthing and bonding, MCB and protection equipment installation. All work is carried out by licensed electrical contractors to IE Rules and IS standards.

5 — UPS Commissioning

Formal startup procedure per manufacturer's commissioning checklist. All operating parameters programmed, monitoring software configured, bypass and battery tests performed. Commissioning certificate issued on successful completion.

6 — Handover & Training

Final documentation package including as-built drawings, test results, warranty certificates, and operations manual. Hands-on operator training for your team. First PM visit scheduled at 3 months post-commissioning. AMC recommendation provided.

Installation Types

Types of UPS Installations We Handle

From compact desktop UPS units to multi-hundred kVA data centre installations, our teams are equipped and experienced across the full range of UPS system types.

Desktop & Rack UPS (1–10 kVA)

Office and IT rack UPS installation for server racks, network closets, and workstation areas. Includes cable management, power distribution units, and shutdown software setup. Fast deployment — typically completed in 2 to 4 hours per unit.

Floor-Mount Single-Phase (10–30 kVA)

Tower or floor-mount UPS for server rooms, branch offices, and mid-size commercial applications. Includes dedicated input MCB, output distribution panel, battery cabinet, and earthing. Typically 1-day installation.

3-Phase Industrial UPS (30–500 kVA)

Large-capacity 3-phase online UPS for data centres, hospitals, manufacturing, and large commercial buildings. Full civil and electrical coordination, tie-in with existing ATS or switchboard, N+1 redundancy configuration, and comprehensive commissioning.

Modular Data Centre UPS

Modular UPS installations for scalable data centre power protection. We install and commission APC Galaxy VX, Eaton 93PM, and Vertiv Liebert EXL modular systems — adding power modules as your capacity grows.

Battery Bank Expansion

Extended battery bank addition to increase runtime on existing UPS systems. Battery string design, additional battery cabinets, intercell connections, and runtime verification testing. No disruption to the existing UPS operation during installation.

UPS Room & Data Centre Build-out

Complete power infrastructure installation for new data centre rooms including UPS, PDUs, ATS, generator interface, cable management, and monitoring. Turnkey service from design to commissioning and handover.

Battery Infrastructure

Battery Bank Installation

The battery bank is the heart of your UPS system. A correctly designed and installed battery bank ensures reliable backup time and maximum battery life.

String Sizing & Design

Battery string voltage and capacity calculated based on required runtime, UPS rated load, DC bus voltage, and battery type. String sizing ensures the battery bank delivers the correct runtime under realistic load conditions.

Battery Racking

Steel battery racks or dedicated battery cabinets selected and installed for the specific battery size and quantity. All racking is properly anchored, levelled, and load-rated. Batteries are installed with correct polarity and torque on all connections.

Intercell Connections & BMS

All intercell cables and links installed to specified cross-sectional area. Battery Management System (BMS) or Battery Monitoring System connected where applicable for continuous health monitoring of individual cells.

Discharge Testing

After installation, the battery bank is fully charged and then discharge-tested under real load to verify that the actual runtime meets the design specification. Test results are documented in the commissioning report.

Learn more about our Battery Banks supply and installation services.

After Installation

Post-Installation Support

Our relationship with your site doesn't end at handover. We provide structured post-installation support to ensure your system stays in optimal condition.

First PM Visit at 3 Months

A complimentary first preventive maintenance visit is scheduled 3 months after commissioning. This early PM checks battery charging voltage, firmware updates, and verifies all installation parameters are within specification.

AMC Recommendation

After installation, we provide a customised AMC proposal for your new system. Getting on an AMC from the start of a UPS's life ensures it is maintained correctly from installation and maximises operational life.

Operator Training

Your facility and IT staff receive hands-on training covering normal UPS operation, understanding alarm conditions, safe battery handling, emergency shutdown procedures, and when to call our service team.

24/7 Helpline

Newly installed systems are covered by a helpline for the first 90 days. Call or WhatsApp us any time for guidance on alarm conditions, operational questions, or to arrange emergency support if required.

FAQ

UPS Installation — Common Questions

Professional UPS installation includes a site survey and power quality assessment, UPS and cable sizing, delivery and positioning of the equipment, all electrical cabling and connections, earthing and bonding to IS standards, battery bank installation and connections, software commissioning and monitoring setup, full load testing, and operator training. A commissioning report is provided on handover.
A 100kVA 3-phase UPS installation typically takes 2 to 3 days depending on the complexity of cabling, earthing requirements, and battery bank size. This includes delivery, electrical installation, commissioning, and load testing. Larger installations above 200kVA may require 4 to 7 days. We provide a detailed installation schedule as part of the project proposal.
Yes. We carry out a detailed site survey before every UPS installation project. The survey covers available floor space and cable routes, incoming power supply quality and capacity, earthing system condition, environmental conditions (temperature, humidity), and load assessment. The survey findings inform the equipment selection and installation design.
UPS commissioning involves verifying all electrical connections, programming the UPS operating parameters, connecting and configuring the monitoring software (SNMP cards, NMC), performing a live load transfer test, conducting a battery discharge test to verify runtime, and completing the manufacturer's commissioning checklist. A signed commissioning certificate is provided.
Yes. We install extended battery banks and standalone battery cabinets for existing UPS systems to increase backup runtime. This includes battery string design and sizing, battery racking and cabinet installation, intercell cabling, connection to the UPS battery bus, BMS integration where applicable, and an initial battery discharge test to verify the installation.
Related Services

Related Services & Products

UPS AMC Services

Protect your newly installed UPS with an Annual Maintenance Contract from day one. We cover all brands with scheduled PM and emergency response.

View AMC Services →

UPS Repair Services

Expert on-site and depot repair for all UPS brands. 30-day warranty on all repair work. 4–8 hour emergency response in metro cities.

View UPS Repair →

Battery Banks

SMF VRLA battery banks from Exide, Quanta, Amaron, and Leoch for extended UPS runtime. All battery bank types available for purchase, hire, or lease.

View Battery Banks →

Also see: Preventive Maintenance  |  3-Phase UPS  |  Industrial UPS  |  UPS Dealers Mumbai  |  UPS Dealers Pune

Plan Your UPS Installation

Tell us your load requirements, site location, and backup time needs. We'll visit, assess, and send a complete installation proposal within 2 business days.

+91-98208-43000 WhatsApp Us