A UPS is only as good as its installation. Sukhai UPS provides end-to-end UPS installation and commissioning services — from site survey and equipment sizing to full electrical installation, battery bank commissioning, software setup, load testing, and operator training. We ensure your power protection system works exactly as designed from day one.
Our installation teams handle every aspect of a UPS project — from initial power assessment to final handover. No element is left to chance.
Detailed survey of the installation site covering floor space, cable routes, incoming power quality, existing earthing system, temperature and humidity, and load requirements.
Load analysis and UPS capacity selection, input and output cable sizing to IS standards, MCB and MCCB sizing for protection, and earthing cable calculation.
All power cabling, conduit, cable trays, MCB panels, and earthing conductors installed to IS 3043 standards. Proper equipotential bonding and surge protection incorporated.
Battery racking and cabinet installation, intercell cabling, string design and connections. For extended battery runtimes, multi-cabinet configurations are designed and installed to manufacturers' specifications.
SNMP/NMC card configuration, shutdown software setup (PowerChute, Eaton IPM, Vertiv Liebert IntelliSlot), SNMP integration with network monitoring systems, email and SMS alerts configuration.
Full load bank testing to verify runtime under rated load, bypass transfer testing, and runtime vs rated capacity verification. Operator training covers safe operation, alarm response, and emergency shutdown procedures.
Every UPS installation project follows a structured six-stage process to ensure it is completed safely, on time, and to the required standard.
Our engineer visits your site to assess power supply quality, available space, cabling routes, earthing system, and load requirements. Survey findings are documented and form the basis of the installation design.
Based on the survey, we prepare a detailed installation design including equipment specification, cable sizes, earthing design, single-line diagram, and project schedule. A written proposal is submitted for your approval.
UPS equipment, batteries, cabling, conduit, cable trays, and electrical accessories are sourced and delivered to site on the agreed schedule. All equipment is inspected on delivery for transit damage.
UPS positioning, all input/output cabling, battery connections, earthing and bonding, MCB and protection equipment installation. All work is carried out by licensed electrical contractors to IE Rules and IS standards.
Formal startup procedure per manufacturer's commissioning checklist. All operating parameters programmed, monitoring software configured, bypass and battery tests performed. Commissioning certificate issued on successful completion.
Final documentation package including as-built drawings, test results, warranty certificates, and operations manual. Hands-on operator training for your team. First PM visit scheduled at 3 months post-commissioning. AMC recommendation provided.
From compact desktop UPS units to multi-hundred kVA data centre installations, our teams are equipped and experienced across the full range of UPS system types.
Office and IT rack UPS installation for server racks, network closets, and workstation areas. Includes cable management, power distribution units, and shutdown software setup. Fast deployment — typically completed in 2 to 4 hours per unit.
Tower or floor-mount UPS for server rooms, branch offices, and mid-size commercial applications. Includes dedicated input MCB, output distribution panel, battery cabinet, and earthing. Typically 1-day installation.
Large-capacity 3-phase online UPS for data centres, hospitals, manufacturing, and large commercial buildings. Full civil and electrical coordination, tie-in with existing ATS or switchboard, N+1 redundancy configuration, and comprehensive commissioning.
Modular UPS installations for scalable data centre power protection. We install and commission APC Galaxy VX, Eaton 93PM, and Vertiv Liebert EXL modular systems — adding power modules as your capacity grows.
Extended battery bank addition to increase runtime on existing UPS systems. Battery string design, additional battery cabinets, intercell connections, and runtime verification testing. No disruption to the existing UPS operation during installation.
Complete power infrastructure installation for new data centre rooms including UPS, PDUs, ATS, generator interface, cable management, and monitoring. Turnkey service from design to commissioning and handover.
The battery bank is the heart of your UPS system. A correctly designed and installed battery bank ensures reliable backup time and maximum battery life.
Battery string voltage and capacity calculated based on required runtime, UPS rated load, DC bus voltage, and battery type. String sizing ensures the battery bank delivers the correct runtime under realistic load conditions.
Steel battery racks or dedicated battery cabinets selected and installed for the specific battery size and quantity. All racking is properly anchored, levelled, and load-rated. Batteries are installed with correct polarity and torque on all connections.
All intercell cables and links installed to specified cross-sectional area. Battery Management System (BMS) or Battery Monitoring System connected where applicable for continuous health monitoring of individual cells.
After installation, the battery bank is fully charged and then discharge-tested under real load to verify that the actual runtime meets the design specification. Test results are documented in the commissioning report.
Learn more about our Battery Banks supply and installation services.
Our relationship with your site doesn't end at handover. We provide structured post-installation support to ensure your system stays in optimal condition.
A complimentary first preventive maintenance visit is scheduled 3 months after commissioning. This early PM checks battery charging voltage, firmware updates, and verifies all installation parameters are within specification.
After installation, we provide a customised AMC proposal for your new system. Getting on an AMC from the start of a UPS's life ensures it is maintained correctly from installation and maximises operational life.
Your facility and IT staff receive hands-on training covering normal UPS operation, understanding alarm conditions, safe battery handling, emergency shutdown procedures, and when to call our service team.
Newly installed systems are covered by a helpline for the first 90 days. Call or WhatsApp us any time for guidance on alarm conditions, operational questions, or to arrange emergency support if required.
Protect your newly installed UPS with an Annual Maintenance Contract from day one. We cover all brands with scheduled PM and emergency response.
View AMC Services →Expert on-site and depot repair for all UPS brands. 30-day warranty on all repair work. 4–8 hour emergency response in metro cities.
View UPS Repair →SMF VRLA battery banks from Exide, Quanta, Amaron, and Leoch for extended UPS runtime. All battery bank types available for purchase, hire, or lease.
View Battery Banks →Also see: Preventive Maintenance | 3-Phase UPS | Industrial UPS | UPS Dealers Mumbai | UPS Dealers Pune